Introduction
The Stenter Machine is used for cotton, chemical fiber and blended knitted and woven fabric open width padding auxiliaries, drying and styling process.
According to the width of the fabric, we can offer the following models:
FSLD-1600/1800/2000/2200/2400/2600/2800/3000/3200/3400/3600/3800/4000
The machine is equipped with horizontal rollers, the diameter is from 360mm to 400mm based on the machine width of 3000mm or wider.
Functions of Stenter Machines
- Heat setting is done by the stenter for lycra fabric, synthetic and blended fabric.
- Width of the fabric is controlled by the stenter.
- Finishing chemical apply on fabric by the stenter.
- Loop of the knit fabric is controlled.
- Moisture of the fabric is controlled by the stenter.
- Spirility controlled by the stenter.
- GSM of the fabric is controlled by stenter.
- Fabric is dried by the stentering process.
- Shrinkage property of the fabric is controlled.
- Curing treatment for resin, water repellent fabric is done by the stenter.
Origin | China |
Main Matching Fabric | open width fabric (70~350g/m²) made of cotton, cotton/polyester,wool,synthtic fiber and other blended fibers |
Heat source | natural gas/circulating conduction oil/steam |
Stentering type | hot air circulating |
Holding type | pin+clip |
Chain type | pitch 60mm,oil-free lubricated |
Rail type | carbon steel+polymer wearing strip |
Working type | horizontal return chain |
Working width | 1000-3600mm |
Working speed | 5-60m/min |
Chamber Nos | 2-12 |
Chamber width | 3000mm |
Insulating board thickness | 150mm |
Temperature of chamber | 100~220ºC |
Pinning & brush overfeed ratio | -20%~40% |
Temp.& Breadth adjustment type | separately adjust on each chamber |
Capacity of machine | 61.5kw+22.75kw*chamber*Nos |
Standard machine power supply | 380V/3P/50HZ |
Control power supply | 220V/24V |
Steam specification of steam box | 3-6kg/cm² |
Steam comsuption of steam box | 100-150kg/h |
Compressed air | 0.35-0.6MPa |
Total weight | 14T+5.8T/chamber*Nos |
Payment Terms
Payment Conditions: 30% down payment by T/T and the balance payment should be T/T or in irrevocable L/C at sight.
Delivery time:90 days from the date of receiving down payment. All payment should be received before delivery in China.
Any questions and requirments,contact us now!